Adoption Evidenceby The Art of Service

Guides

How to measure change recording adoption after an implementation

Whether change recording is actually happening now, expressed as a number you can put in front of management.

What good looks like, so there is something to measure against: Every change to a live service has a record, including the small ones, and the record is created before the change rather than reconstructed after an incident.

Ask the people doing the work, not the system. A tool reports what was typed into it, which is a claim about the tool. Whether change recording is followed is a fact about the team, and the team is the only source for it.

Ask the same question again a month later. One measurement is an opinion with a decimal point. Two measurements taken the same way is the first thing anyone can act on.

Where the records help: a change identifier, request or release column linked to the affected service. That is what a reconstruction reads, and it is also the cheapest ongoing check that the survey answers and the system agree with each other.

Do this with Adoption Evidence

One engagement free. Curate the questions, baseline the team, and generate a report where every number traces to a response or a file. No card.

Already have a The Art of Service account? Sign in.

Related